2022 | Professional
Entrant Company
Category
Client's Name
Country / Region
Attraction, drainage, and stickiness are the three core considerations at the beginning of the design. We want to design a park that focuses on children and is full of natural education, and has never appeared on the market at home and abroad. The biggest problem is that there is no reference case. It is a big challenge for us. Moreover, the site is located in a depression with an average depth of 7-8 meters. Waterlogging drainage is the second problem to be faced directly. The site retains the original terrain to the maximum extent, and the design makes the best use of the situation. Among them, the ponds, wetlands, and camphor trees in the site are the most important memory points. How to use them and make them play the biggest role is the third problem.
From beginning to end, the team design process is a process of solving the actual site problems one by one. In the process of solving the problem, using the characteristics of the site, we designed and created a civic park translated from animation scenes with a clear theme focusing on children.
Finally, the design integrates education and entertainment into ecological restoration, wetlands for exploration, mirror lakes for recreation, and play for children's joy... As a green gift box for Dongshan Bay, the design sincerely hopes that Citizens can immerse themselves here, forget their age, and start a special happy time...
Entrant Company
Tremend Sp. z o.o. Sp. k.
Category
Interior Design - Hotels & Resorts
Entrant Company
Professor Li Baofeng's studio of HUST
Category
Architectural Design - Mix Use Architectural Designs
Entrant Company
QING HO SPACE DESIGN CO,LTD.
Category
Interior Design - Commercial
Entrant Company
SooHo Choi
Category
Conceptual Design - Interaction